读书简介

本书规定了火力发电工程水处理及制氢设备和系统的施工质量验收标准及单项工程质量评价、单台机组质量评价和整体工程质量评价的相关要求。本部分适用于新建、扩建和改建的单机容量300MW~1000MW级火力发电工程水处理及制氢设备和系统的施工质量验收和工程质量评价。300MW以下火力发电工程及核电站常规岛、BOP水处理及制氢设备和系统的施工质量验收和工程质量评价,可参照本书执行。

目录

书名页

版权页

Foreword

1 Scope

2 Normative References

3 General Provisions

4 Construction Quality Acceptance

4.1 Provisions for Construction Quality Acceptance

4.2 Construction Quality Acceptance Scope Division and General Tables

4.3 General Standards

4.4 Raw Water Pretreatment System

4.5 Sea Water Desalination System

4.6 Demineralization System

4.7 Condensate Treatment System

4.8 Circulating Water Treatment System

4.9 Wastewater Treatment System

4.10 Hydrogen Station

4.11 Steam—Water Centralized Sampling,Feedwater,Boiler water Treatment System

4.12 Anti-corrosion Work

5 Individual Project Quality Evaluation

5.1 Basic Provisions

5.2 Evaluation Provisions

5.3 Evaluation Contents

5.4 Evaluation Methods

5.5 Evaluation of Equipment Installation Construction Quality

5.6 Evaluation of Rotating Machinery Installation Construction Quality

5.7 Evaluation of Piping and Valve Installation Construction Quality

5.8 Evaluation of Anti-corrosion,Painting and Insulation Construction Quality

5.9 Summary of Scores of Construction Quality Evaluation of Various Project Parts(Scope)of the Individual Project

5.10 Individual Project Quality Evaluation Report

6 Single Unit Quality Evaluation

7 Evaluation of Overall Project Quality

Appendix A (Informative)Hydrogen Pipe Installation Parameter Datasheet

Appendix B (Normative)Checklist of Implementation of Compulsory Provisions

Appendix C (Normative)Unit Project Appearance Quality Acceptance Visa Table

Appendix D (Normative)List of Unit Project Visa Items

Explanations of Provisions

1 Scope

2 Normative References

3 General Provisions

4 Construction Quality Acceptance

4.1 Provisions for Contruction Quality Acceptance

4.2 Construction Quality Acceptance Scope Division and General Tables

4.3 General Standards

4.4 Raw Water Pretreatment System

4.5 Sea Water Desalination System

4.6 Demineralization System

4.7 Condensate Treatment System

4.8 Circulating Water Treatment System

4.9 Wastewater Treatment System

4.10 Hydrogen Station

4.11 Steam-Water Centralized Sampling,Feedwater,Boiler Water Treatment System

4.12 Anti-corrosion Work

5 Individual Project Quality Evaluation

5.1 Basic Provisions

5.2 Evaluation Provisions

5.3 Evaluation Contents

5.4 Evaluation Methods

5.5 Evaluation of Equipment Installation Construction Quality

5.6 Evaluation of Rotating Machinery Installation Construction Quality

5.7 Evaluation of Piping and Valve Installation Construction Quality

5.8 Evaluation of Anti-corrosion,Painting and Insulation Construction Quality

5.9 Summary of Scores of Construction Quality Evaluation of Various Project Parts(Scope)of the Individual Project

5.10 Individual Project Quality Evaluation Report

6 Single Unit Quality Evaluation

7 Evaluation of Overall Project Quality

Appendix A(Informative)Hydrogen Pipe Installation Parameter Datasheet

Appendix B(Normative)Checklist of Implementation of Compulsory Provisions

Appendix C(Normative)Unit Project Appearance Quality Acceptance Visa Table

Appendix D(Normative)List of Unit Project Visa Items