GB 50996-2014 地下水封石洞油库施工及验收规范(英文版)
图书信息
| 作者 | 中华人民共和国住房和城乡建设部 |
| 出版社 | 中国计划出版社 |
| ISBN | 9787518213054 |
| 出版时间 | 2021-02-01 |
| 字数 | 14.3万 |
| 分类 | 科技,工业技术,其他 |
读书简介
本规范共分20章和2个附录,主要技术内容包括:总则,术语,基本规定,施工准备,施工测量,地质预报,明槽、明洞和洞口段,开挖,装卸渣与运输,支护,水幕系统,竖井施工,注浆,通风防尘与供风、供水、供电,排水,竖井设备及管道安装,铺砌和封塞,监控量测,安全、环境和健康,交工验收等。
目录
中华人民共和国住房和城乡建设部公告
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General provisions
2 Terms
3 Basic requirements
4 Construction preparations
4.1 Construction investigation
4.2 Technical preparations
4.3 Sites and temporary works
4.4 Materials preparation
5 Construction survey
5.1 General requirements
5.2 Ground surface control survey
5.3 Underground control survey
5.4 Cross-section survey
5.5 Breakthrough survey
5.6 Storage capacity survey
6 Geological prediction
7 Open channels,open tunnels and tunnel portal sections
7.1 Open channels
7.2 Open tunnels
7.3 Tunnel portal section
7.4 Quality acceptance
8 Excavation
8.1 General requirements
8.2 Excavation methods
8.3 Drilling and blasting
8.4 Quality acceptance
9 Muck loading,unloading and transportation
9.1 General requirements
9.2 Muck loading,unloading and transportation
9.3 Quality acceptance
10 Supporting
10.1 General requirements
10.2 Anchor bolts and cables
10.3 Shotcrete
10.4 Metal meshes
10.5 Steel arches
10.6 Lining
10.7 Pre-consolidation
10.8 Quality acceptance
11 Water curtain system
11.1 General requirements
11.2 Construction
11.3 Water supply to water curtain system
11.4 Quality acceptance
12 Shaft construction
12.1 General requirements
12.2 Excavation
12.3 Supporting
12.4 Quality acceptance
13 Grouting
13.1 General requirements
13.2 Grouting operations
13.3 Grouting effect inspection
13.4 Quality acceptance
14 Ventilation,dust control,compressed-air supply,water supply and power supply
14.1 Ventilation and dust control
14.2 Compressed-air supply
14.3 Water supply
14.4 Power supply
15 Drainage
15.1 General requirements
15.2 Construction
16 Shaft equipment and pipeline installation
16.1 General requirements
16.2 Shaft lifting system
16.3 Fabrication and installation of shaft steel structure
16.4 Coating work
16.5 Installation of anchor plate,casing pipe support and shaft-bottom cylinder
16.6 Welding,lifting and installation of casing pipe
16.7 Installation of inner pipe,pump and auxiliary devices
16.8 Quality acceptance
17 Paving and plugging
17.1 Paving
17.2 Plugging
17.3 Quality acceptance
18 Monitoring and measurement
18.1 General requirements
18.2 Measurement items and methods
18.3 Processing and feedback of measurement data
19 Safety,environment and health
20 Project delivery and acceptance
20.1 General requirements
20.2 Division of construction quality acceptance units
20.3 Project construction quality acceptance
20.4 Procedure and organization of project construction quality acceptance
Appendix A Main construction methods of underground water-sealing storage cavern
Appendix B Test and water supply of water curtain system
Explanation of wording in this code
List of quoted standards
- 做好男人(百读)
- 2019年全国导游人员资格考试辅导教材-全国导游基础知识(圣才电子书)
- 502(暂无)
- 2020年江西省军转干部安置考试《法律基础知识》考点手册(圣才电子书)
- 粗糙且含糊不清的怪盗预告信:警察厅特案专职搜查课事件簿([日] 仓知淳)
- 00后整顿职场指南(赵雪)
- 女性排毒与食补(元秀 编著)
- 数据资本论([美]阿莱克斯·彭特兰[美]亚历山大·利普顿 [美]托马斯·哈德乔诺)
